Trade Lead Description:
We perform complex preparatory
works, feasibility studies, design
and supply equipment for
hydraulic borehole quartz sand in
all kinds of fields and off-balance
sheet fields with different depths
of development, with the
planting of the roof, keeping the
surface terrain or working off
camera without collapse of the
overlying rocks. Economic
efficiency of a method is much
higher than quarry development. Keeping surface of the field. In
the mining involve any volumes of
deposits of sands. Terms of
preparation and feasibility
studies, project: 5-7 months. Price of the set of the borehole
hydraulic mining with minimal
equipment: from $ 300,322.00
USD
Type of Offer: |
Offer to Sell |
Quantity: |
Not Specified |
Packaging: |
Not Specified |
Price / Incoterms Conditions: |
Not Specified |
Posted from Russia - Astrakhanskaya on 1 August, 2013
|
|